Østre Gasværk Teater

Østre Gasværk Teater - Upgrade of Electrical Installations

After the rebuilding of the Oestre Gasworks Theatre (Østre Gasværk Teater), the theatre re-opened, as the first performance was set in October 2018.  Balslev participated in the upgrading of the electrical installations in connection with audio, light, microphones, Wi-Fi and networks.
The authorities had demanded to strengthen the building. This has been done by establishing a new steel structure that can carry all stage technology. During this process all existing electrical installations, were reworked to accommodate future needs as well as the desire for a more flexible connectivity.
In the future all inventory and public facilities will be mobile, therefore the electrical installations had to be designed to handle this.
As the new electrical installations had to be updated in relation to today’s standards and legislation, it required a complete redesign of the main switchboard, distribution panels as well as all electrical installations on site.

AREAS OF RESPONSIBILITY
Balslev was responsible for upgrading electrical installations in connection with audio, lighting, microphones, Wi-Fi and net-works.